From: WayneRESA
Date: Tue, Aug 25, 2015 at 2:28 PM
Subject: Friday 8/28 6PM – 10PM network infrastructure work

Staff will continue work on the installation of a new core network switch Friday 8/28 from 6PM to 10 PM. This is work continuing from last Friday when a district connectivity issue was encountered. It is important that the equipment is installed prior to the start of the school year to meet increased school district network bandwidth demands.

During the maintenance window connectivity between the Internet and school district networks/Wayne RESA servers will be interrupted. While the window is 4 hours, the expectation is that the overall interruption to service will be much less.

Please check the website:

http://servicestatus.resa.net/

for the status of the Friday 8/28 maintenance window and to review future events.